• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEERING ASSEMBLY REPAIR INSTRUCTIONS - REVERSE BALANCE LEVER REPLACEMENT (cont) - TM-5-1940-277-34_400
STEERING ASSEMBLY REPAIR INSTRUCTIONS - SCOOP CONTROL ROD REPLACEMENT

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  379    380    381    382    383  384  385    386    387    388    389  
TM 5-1940-277-34 STEERING ASSEMBLY REPAIR INSTRUCTIONS - REVERSE BALANCE LEVER REPLACEMENT (Continued) LOCATION ITEM ACTION REMARKS 6. Reverse balance Reverse control Install pivot. lever (13) pivot (6) Then fit one steel and one tufnol washer onto pivot and hold in position while connecting reverse balance lever/pivot assembly to out- board reverse balance lever (13). 7. Reverse control Tufnol washer Install and Use two 19 mm pivot (6) (9), steel tighten. wrenches.  After washer (8) and tightening, nut (7) operate scoop washer (8), control on opera- nut (7) tor's console. If movement is hard loosen nut on reverse con- trol pivot (6) slightly and see if this eases operation of scoop control. NOTE FOLLOW    ON    MAINTENANCE    PROCEDURE:    Do    scoop    adjustment    check    and    adjustment procedure as required (TM 5-1940-277-20). 2-389 (2-390 Blank)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.