• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CRANKSHAFT INSPECTION AND REPLACEMENT INSTRUCTIONS (cont)
CRANKSHAFT INSPECTION AND REPLACEMENT INSTRUCTIONS (cont) - TM-5-1940-277-34_491

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  468    469    470    471    472  473  474    475    476    477    478  
TM 5-1940-277-34 CRANKSHAFT INSPECTION AND REPLACEMENT INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS REMOVAL 1. Timing gear a. 8 bolts (2) Remove. Use 9/16 in soc- housing (1) ket and ratchet. b. 2 socket head Remove. Use 5/16 in hex screws (3), key wrench housing (1) (Allen). and gasket (4) 2. Connecting 12 bearing cap a. Loosen bolts. Use 5/8 in soc- rod (5) bolts (6), 6 ket, 6 in exten- bearing caps (7) sion and ratchet. and 6 bearing liners (8) b. Tap bolts Use non-metallic lightly to hammer. release con- necting rod cap from crank- shaft. c. Remove caps Make sure that and liners. caps and liners are kept in order for reassembly to original connec- ting rod. 3. Cylinder block Oil pump inlet a. Unscrew and Use 1/2 in socket (9) pipe (10) remove cap and ratchet. screw (11) and washer (12). b. Bend back Use 7/8 in lockwasher wrench. tab (13) and unscrew pipe union (14). 3-59







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.