• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION REPAIR INSTRUCTIONS (cont) - TM-5-1940-277-34_576
TRANSMISSION REPAIR INSTRUCTIONS (cont) - TM-5-1940-277-34_578

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  555    556    557    558    559  560  561    562    563    564    565  
TM 5-1940-277-34 TRANSMISSION REPAIR INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS c. Rotate ring When everything gear to aline is in correct teeth of position the plates with rear of ring teeth on gear should be clutch hub. against assembly DO NOT FORCE. tool or flush with rear thrust face of drive gear.  DO NOT MOVE SUBASSEMBLY FROM ASSEMBLY TOOL OR MOVE GEAR FORWARD. NOTE Subassembly on assembly tool must be placed on arbor press table before next step. d. Bearing (24) a. Place over pro- truding drive gear shaft (19) and aline with bore at front of forward clutch cylinder (26). b. Press bearing down until bearing is fully seated and snap ring grooves in front of bearing are exposed. e. External snap Install on drive ring (16) gear shaft. f. Internal snap Install in clutch ring (15) cylinder. 3-147







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.