TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
FENDERING (RUB RAIL) REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Materials/Parts
Tools and Special Tools
Forward Repair System (FRS)
Personnel Required
Two
0015 00-1