TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ENGINE STOP CONTROL CABLE AND HANDLE REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Control panel access panel opened and secured
(TM 5-1940-322-10).
Engine hatches opened and secured
(TM 5-1940-322-10).
Materials/Parts
0032 00-1