• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Chapter 3. UNIT MAINTENANCE INSTRUCTIONS
Section II. REPAIR PARTS, SPECIAL TOOLS, AND EQUIPMENT

TM-5-2090-202-12-P Cradle Bridge Erection Boat Twin Jet Aluminum Hull (2090-01-106-9789) Manual
Page Navigation
  24    25    26    27    28  29  30    31    32    33    34  
TM5-2090-202-12&P
TM 2090-12&P/1A
3-1. UNPACKING AND CHECKING THE EQUIPMENT - Continued
(3) Install left and right stanchion base (7)
with flat washers (8) and bolt (9),
lockwashers (10) and nuts (11).
(4) Install rear stanchion (12) with beveled
top facing inboard, secure stanchions with
pin (13).
f. Perform the following at the transporter:
(1) Install the left and right upper half of the
inboard roller assemblies (1) on the rear
of transporter (2).  Secure upper half of
roller (1) to base of boom (3) with washer
(4), bolts (5), lockwashers (6) and nuts (7).
(2) Install  lower  half  of  inboard  roller
assemblies (8) with bolts (9), flatwashers
(10), lockwashers (11) and nuts (12).
3-2. SERVICING THE EQUIPMENT
a. Perform the preventive maintenance checks and services contained in the PMCS Table.
b. Lubricate all points as shown in LO 5-2090-202-12/LI 2090-12.
c. Schedule the next preventive maintenance checks and services on DD Form 314, Preventive Maintenance
Schedule and Record.
d. Report all deficiencies on SF 368 if the deficiencies appear to involve unsatisfactory design. Marine Corps users
submit forms as prescribed by TM 4700-15/1.
3-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.