• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REAR RUBBER PADS AND RAILS MAINTENANCE INSTRUCTIONS (cont) -502490063
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS

TM-5-2090-202-12-P Cradle Bridge Erection Boat Twin Jet Aluminum Hull (2090-01-106-9789) Manual
Page Navigation
  53    54    55    56    57  58  59    60    61    62    63  
TM 5-2090-202-12&P
TM 2090-12&P/1A
3-17. REAR RUBBER PADS AND RAILS MAINTENANCE INSTRUCTIONS-Continued
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
4.
Rubber pad
a.
Pad (5)
a.
Remove all old
adhesive to bare
metal
b.
Apply adhesive to
pad
c.
Install pad
b.
28 screws (4), washers
Install
Repeat steps a and b for
(3), washers (2), and
other rear pad. Make sure
nuts (1)
bolt heads are below the
rubber pads (5).
5.
Rail (8), 23 lockwashers
Install
(7) and 23 nuts (6)
3-31






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.