• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOADING - Continued
LOADING - Continued

Cradle, Bridge Erection Boat, Twin Jet, Aluminum Hull \(Nsn 2090-01-106-9789\)
Page Navigation
  6    7    8    9    10  11  12    13    14    15    16  
img
TM 5-2090-202-12&P
TM 2090-12&P/1A
2-4. LOADING-Continued
n. Rewind the winch to pull the cradle onto the transporter. Continue to rewind the winch cable and lower the boom
until the cradle is stopped by the seating of the rear cradle stop pins (1) against the stop brackets (2).
CAUTION
Idle engine at 500 RPM maximum to prevent damage to hydraulic pin.
o. Pull the hydraulic pin lever to engage the forward locking pin.
2-7






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.