• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS
DOLLY ASSEMBLY-MAINTENANCE INSTRUCTIONS - Continued

Cradle, Bridge Erection Boat, Twin Jet, Aluminum Hull \(Nsn 2090-01-106-9789\)
Page Navigation
  55    56    57    58    59  60  61    62    63    64    65  
img
TM 5-2090-202-12&P
TM 2090-12&P/1A
3-18. DOLLY ASSEMBLY MAINTENANCE INSTRUCTIONS-Continued
LOCATION/ITEM
ACTION
REMARKS
REMOVAL
NOTE
The saddle is removed from the dolly assembly before the dolly assembly is removed
from the cradle. This makes the removal of the dolly from the cradle easier.
1.
Saddle and pivot shaft
assembly
a.
Two cotter pins (1)
and shaft (2)
WARNING
Support the saddle when removing shaft. Failure to do so may result in
injury to personnel or damage to equipment.
b.
Two spacers (3)
Remove
c.
Saddle (4)
Remove
2.
Stanchions
a.
Nut (5) and bolt (6)
Remove
b.
Stanchion (7)
Remove
c.
Rubber Bumper (8)
Remove screw (9) and
Repeat steps a through
washer (10).
c for the other stanchion.
3.
Saddle rubber pads
a.
8 nuts (11), lock
Remove
washers (12), cap-
screws (13) and
washers (14).
b.
Pad (15)
Scrape off
Repeat steps a and b
for the other pad.
3-33






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.