TM 5-5420-202-20-3
UNIVERSAL JOINT REPLACEMENT (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Inspection
Installation
Thickness gage
TOOLS: 13/16 in. socket with 1/2 in. drive
Oxy-acetylene welding equipment
2 in. extension with 1/2 in. drive
10 in. flat file
Hammer
Socket wrench handle with 1/2 in. drive
3/4 in. socket with 1/2 in. drive
Torque wrench with 1/2 in. drive
1-1/2 in. combination box and
(0-175 lb-ft capacity) (0-237 Nm)
open end wrench
Diagonal cutting pliers
Torque wrench with 3/8 in. drive
Slip joint pliers
Alining punch
(0-200 lb-in) (0-23 Nm)
Adapter 1/2 in. -3/8 in.
Pinch bar
Crowbar
SPECIAL TOOLS: Center punch (Figure F-9, Appendix F)
Rubber gloves (Item 69, Appendix D)
SUPPLIES: Lockwire (Item 61, Appendix D)
Industrial goggles
Dry cleaning solvent (Item 55, Appendix D)
(Item 70, Appendix D)
Paint brush (Item 79, Appendix D)
Rags (Item 65, Appendix D)
Brazing alloy (Item 80, Appendix D)
Rope (Item 66, Appendix D)
Welding flux (Item 81, Appendix D)
Two
PERSONNEL:
REFERENCES:
Remove transmission shroud (page 9-2)
Remove transmission shroud support (page 9-15)
Remove turbosupercharger outlet elbow (page 7-76)
Block both tracks front and rear, place transmission selector lever
in neutral (N), and make sure brake is released
Pull transmission mounting guide towards rear
Go on to Sheet 2
12-15