• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION-continued - TM-5-5420-202-340042
INSTALLATION-continued - TM-5-5420-202-340044

TM-5-5420-202-34 M60A1 Tank Chassis Transporting: for Bridge Armored-Vehicle-Launched; Scissoring Type Class 60 (5420-00-889-2020) Manual
Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
TM 5-5420-202-34
POWER TAKEOFF REPLACEMENT (Sheet 6 of 8)
Place gasket (L) in position over mounting
11.
studs (M) on engine housing.
Place power takeoff
(A) in position
12.
on engine mounting
studs (M). Power
takeoff (A) must be
positioned so that
fuel pump (E) is at
approximately eight
o'clock position.
13.
Carefully guide power takeoff (A) short
splined input shaft (N) into hole in splined
adapter (P).
Go on to Sheet 7
3-11






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.