TM 5-5420-202-34
ENGINE REPLACEMENT
Power Takeoff Installation On Replacement Engine (Sheet 1 of 11)
NOTE
Replacement engines are received without the power takeoff unit
installed. The power takeoff and associated hardware must be removed
from the unserviceable engine.
The following instructions are for
installation of the power takeoff on a replacement engine.
Torque wrench with 1/2 in. drive (0-200 lb-ft) (0-136 N. m)
TOOLS:
7/16 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
5/8 in. socket with 1/2 in. drive
11/16 in. socket with 1/2 in. drive
3/4 in. socket with 1/2 in. drive
13/16 in. socket with 1/2 in. drive
9/16 in. combination box and open end wrench
5/8 in. combination box and open end wrench
7/8 in. combination box and open end wrench
5/16 in. socket head key
Stud remover/installer
8 in. adjustable wrench
8 in. socket wrench extension with 1/2 in. drive
6 in. machinist rule
SUPPLIES:
Power takeoff and attaching parts - removed from unserviceable engine
REFERENCE:
TM 5-5420-202-20
Go on to Sheet 2
3-39