• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Power Takeoff Installation On Replacement Engine (Sheet 7 of 11)
Power Takeoff Installation On Replacement Engine (Sheet 9 of 11)

TM-5-5420-202-34 M60A1 Tank Chassis Transporting: for Bridge Armored-Vehicle-Launched; Scissoring Type Class 60 (5420-00-889-2020) Manual
Page Navigation
  53    54    55    56    57  58  59    60    61    62    63  
TM 5-5420-202-34
ENGINE REPLACEMENT
Power Takeoff Installation On Replacement Engine (Sheet 8 of 11)
25.
Using 9/16 inch wrench, connect connector
of oil line hose assembly (AM) to 45-
degree elbow (AN) in power takeoff
oil inlet port.
26.
Run hose (AM) around right side of engine
to plugged oil port (AP).
----
If plug in port (AP) has socket head, use
27.
5-16 inch socket head key to remove it.
If plug has hexagon head, use 11/16 inch
socket to remove it.
Using 3/4 inch socket, install bushing
28.
(AQ) in oil port (AP).
29.
Using adjustable wrench, install elbow
(AR) in bushing (AQ).
30.
Using 9/16 inch wrench, connect hose
assembly (AM) to elbow (AR).
Go on to Sheet 9
3-46






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.