• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT - Continued
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  326    327    328    329    330  331  332    333    334    335    336  
img
. .
TM 5-5420-226-20-3
TM 5-5420-202-20-3
BASKET/CONTROL PANEL POWER HARNESS RPLACEMENT (Sheet 4 of 4)
2.
Install connector (K) of harness (A)
at basket disconnect (page 10-296.69).
3.
Connect connector (L) at master control
panel. Using spanner wrench, tighten
nut (M).
4.
Connect three ground straps at batteries
(page 10-268).
5.
Install right bulkhead access cover
page 17-3).
6.
Perform functional check (TM 5-5420-
226-10).
End of Task
5-30
10-296.28
Change 6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.