• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT - Continued
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  330    331    332    333    334  335  336    337    338    339    340  
img
.
TM 5-5-5420-202-20-3
TM 5420-226-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 4 of 5)
INSTALLATION:
Place harness assembly (A) behind
1.
straps (E) and through clamps (H)
as shown.
2.
Using 7/16 inch socket, install screws
(B), new lockwashers (C), and flat washers
(D) to secure straps (E) at three locations.
Using 7/16 inch socket, install screws (F)
3.
and flat washers (G) to secure clamps (H)
at six locations.
4.
Using 7/16 inch socket, install screws
(J) and new lockwashers (K) to secure
clamps (L) at vehicle floor and at purge
pump handle (M).
Go on to Sheet 5
5-34
10-296.32
Change 6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.