• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  356    357    358    359    360  361  362    363    364    365    366  
img
TM 5-5420-226-20-3
TM 5-5420-202-20-3
BASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 2 of 6)
At back side of gage indicator panel,
4.
use spanner wrench to disconnect con-
nector (K) from gage indicator panel.
5.
Using 7/16 inch socket and 7/16 inch
wrench, remove screw (L), three star
washers (M), and nut (N) securing ground
lead (P) to gage indicator panel.
6.
Disconnect electrical leads (Q) and
(R) (CKT 27).
7.
Using 7/16 inch socket, remove screw (S) and lockwasher (T) securing ground leads
(P) and (U) and clamp (V) to center post.
Go on to Sheet 3
15-606.58
0 29
Change 6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.