• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DUST DETECTOR WARNING LIGHT HARNESS ASSEMBLY REPLACEMENT
DUST DETECTOR WARNING LIGHT BOX ASSEMBLY AND MOUNTING BRACKET REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  421    422    423    424    425  426  427    428    429    430    431  
img
.
TM 5-5420-226-20-3
DUST DETECTOR WARNING LIGHT HARNESS ASSEMBLY REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
Connect harness connector (A) to dust detector warning light box (B).
1.
Connect dust detector warning light short lead(C) to hull intermediate lead assembly(D).
2.
Connect lead connectors 509A and 509L of dust detector warning light wiring harness(E)
3.
to lead connectors 509A and 509L of powerplant warning light harness (F) and front
master harness assembly (G) (four places).
Install screw (H) with lockwasher (J) through bracket (K).
4.
Install ground leads (L), washer (M), and nut (N) onto screw (H). Using one 7/16 `rich
5.
wrench to hold screw (H), use another 7/16 inch wrench to tighten nut (N).
Connect three battery ground straps (page 10-268).
6.
Turn on master power in driver's compartment.
7.
Press to test lamp on dust detector warning
8.
light box (B).
A. If light comes on, proceed with task.
If light failed to come on, troubleshoot.
B.
End of Task
10-298.13
Change 1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.