• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING FORWARD CROSS TUBE REPLACEMENT - Continued
SHIFTING CONTROL TO FORWARD INBOARD LINK ASSEMBLY TUBE REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  487    488    489    490    491  492  493    494    495    496    497  
img
. .
TM 5-5420-226-20-3
SHIFTING FORWARD CROSS TUBE REPLACEMENT (Sheet 4 of 4)
ADJUSTMENT:
NOTE
When adjusting clevise or rod ends,
make certain that threads on control
tubes extend past the "U" of the
clevis, or past the gage opening in
the rod end to ensure a positive grip.
1.
Using two 9/16 inch wrenches and steel tape, adjust rod ends to the center-to-center
distance measured and recorded in steps 3 and 4 of REMOVAL.
Using torque wrench and crow foot adapter,
2.
tighten nuts (A) against each rod end
(B) to 16-18 lbs-ft (23-24 N·m).
INSTALLATION:
Position one rod end of tube (C) in link
(D).
Using 9/16 inch wrench, install bolt
(E).
Position other rod end of tube (C) in
3.
link (F).
4.
Using 9/16 inch wrench, install bolt
(G).
5.
Adjust shifting control and linkages
(page 11-53).
Remove blocks from track.
6.
End of Task
TA169026
11-25






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.