• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
TM 5-5420-226-20-3
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR (Sheet 8 of 11)
10.
Manually install nuts (K) and rod ends
(L) on stud (M).
NOTE
When adjusting clevises or
rod ends,  make certain
that threads on control
tubes extend past the gage
opening in the rod end to
ensure a positive grip.
11.
Using two 9/16 inch wrenches and 6
inch rule, adjust rod ends (L) to obtain
the same center-to-center distance
between rod end holes as measured
and recorded in steps 3 and 4, DISASSEMBLY.
12.
Using torque wrench and crow foot adapter,
tighten nuts (K) against rod ends (L)
to 16-18 lb-ft (22-24 N·m).
TA169050
Go on to Sheet 9
11-49






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.