• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  512    513    514    515    516  517  518    519    520    521    522  
img
.
TM 5-5420-226-20-3
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR (Sheet 9 of 11)
13.
Position stud and rod end bearing assem-
bly (M) with rod end holes alined with
the clevis holes in link assemblies (B)
and (H).
14.
Using 9/16 inch wrench, install two
bolts (N) through link assemblies (B)
and (H) and stud and rod end bearing
assembly (M).
15.
Using torque wrench and 9/16 inch socket,
tighten two bolts (N) to 15-20 lb-ft
(20-27 N·m).
INSTALLATION:
1.
Position bracket assembly (A) and shield
(B) against hull wall with mounting holes
alined.
2.
3.
4.
5.
6.
to 15-20 lb-ft (20-27 N·m).
Go on to Sheet 10
TA169051
11-50






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.