• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  527    528    529    530    531  532  533    534    535    536    537  
img
TM 5-5420-226 -20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 13 of 28)
68.
At driver's station, use 9/16 inch wrench
to install six bolts (J) and secure access
plate (K) to floor in front of driver's seat.
Go to right rear of vehicle and try to insert
69.
locating pin into alinement hole (C) and through
link (AN). If locating pin can be inserted,
shift linkage is in adjustment. Remove
locating pin and go to step 125. If locating
pin can not be inserted, go on to step 70.
70.
Remove powerplant (page 5-2).
Go on to Sheet 14
TA169066
11-65






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.