• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRAKE SWITCH (STOPLIGHT) REPLACEMENT - Continued
BRAKE PRESSURE GAGE, TUBE ASSEMBLY, REDUCER, AND GASKET REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  637    638    639    640    641  642  643    644    645    646    647  
img
. . . . . . . .
TM 5-5420-226-20-3
BRAKE PRESSURE GAGE,TUBE ASSEMBLY. REDUCER, AND GASKET REPLACEMENT
(Sheet 1 of 7)
PROCEDURE INDEX
PAGE
PROCEDURE
13-35
Removal
Cleaning and Inspection
13-38
Installation
13-39
TOOLS: Screwdriver, cross-tip
Ratchet with 1/2 in. drive
1-1/8 in. socket with 1/2 in.drive
l/2 in.combination box and open end wrench
9/16 in.combination box and open end wrench
11/16 in.combination box and open end wrench
3/4 in.combination box and open end wrench
Funnel, 1 qt cap. with flexible spout
SUPPLIES:
Container, 1 qt. cap.
Rags (Item 65, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
1/2 in. plastic plug
Brake fluid (Item 40, Appendix D)
Gasket (AN 901-5C)
Packing (MS 28778-4)
Masking tape (Item 57, Appendix D)
REFERENCE:
TM 5-5420-226-10
PRELIMINARY PROCEDURES:
Block tracks (TM 5-5420-226-10)
Place MASTER BATTERY switch in OFF position
(TM 5-5420-226-10)
Place transmission shift lever in neutral "N"
(TM 5-5420-226-10)
Go on to Sheet 2
TA169163
13-35






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.