• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PARKING BRAKE CONTROL ASSEMBLY (ENGINE COMPARTMENT) REPLACEMENT - Continued
PARKING BRAKE CONTROL ASSEMBLY (ENGINE COMPARTMENT) REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  717    718    719    720    721  722  723    724    725    726    727  
img
TM 5-5420-226-20-3
PARKING BRAKE CONTROL ASSEMBLY (ENGINE COMPARTMENT) REPLACEMENT (Sheet 9 of 15)
Position control assemblies (C and D) to transmission. Place ends with nuts(E) at brake
2.
housings.
Position control assemblies (C and D) through holes (F) in brake housings.
3.
4.
Install new preformed packing into nuts (G) before installing.
While inserting control assemblies (C and D), install the following parts in the following
5.
order: new packing with new retainer (H), nut with new packing (G), washer (J), spring
(K), and washer (L).
6.
Continue inserting control assemblies (C and D), guide ends of rods through brake lever
(M), and install nuts (N) onto rod ends. It may be necessary to compress springs (K)
to permit rod ends to pass through brake levers (M).
Go on to Sheet 10
13-115






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.