• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HUB AND ARM ASSEMBLY REPAIR - Continued
HUB AND ARM ASSEMBLY REPAIR - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  759    760    761    762    763  764  765    766    767    768    769  
img
.
TM 5-5420-226-20-3
HUB AND ARM ASSEMBLY REPAIR (Sheet 6 of 9)
ASSEMBLY:
1.
If deflector (A) was removed, care-
fully position new deflector in place
over upper spindle against machined
ridge in arm (B). Assure base of U-shaped
deflector (A) is toward arm and open
end toward threaded end of spindle.
Tap deflector (A) lightly with hammer to
assure it seats fully against arm (B).
Position shock absorber bearing (C) on arm (B).
2.
Install replacer over bearing (C) and arm (B).
Turn replacer nut until bearing (C) is centered
in arm (B). Remove replacer.
Stake bearing (C) to arm (B) at three
3.
equally spaced locations on each side
of bearing (C).
Position bearing (D) on arm (B). Install bearing
4.
driver over bearing (D). Turn nut of bearing
driver until bearing (D) is centered in arm (B).
Remove bearing driver.
5.
Stake bearing (D) to arm (B) at three equally
spaced locations on each side of baring (D).
Go on to Sheet 7
Change 3
14-22






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.