• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRACK SUPPORT ROLLER REPLACEMENT - Continued
TRACK SUPPORT ROLLER ASSEMBLY REPAIR

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  785    786    787    788    789  790  791    792    793    794    795  
img
. . . .
TM 5-5420-226-20-3
TRACK SUPPORT ROLLER REPLACEMENT (Sheet 10 of 10)
22.
For all support rollers, do steps 23 and 24.
Place static ground spring (S) into access
23.
cover plate (T) so tang is in hole inside
cover plate (T).
Twist spring (S) into place.
24.
Position new gasket (U) and cover plate
25.
(T) to hub, and secure to hub with six lock-
washers (V), flat washers (W) and screws (X).
26.
Using 9/16 inch socket, tighten screws
(X) alternately.
27.
Using grease gun to lube fitting on cover plate,
lube support roller.
28.
If jack was used, lower it. Remove jack
and planks (or plates).
29.
Have second technician start engine and move vehicle so two centerguides can be
installed (TM 5-5420-226-10).
Install centerguides (TM 5-5420-226-10).
30.
Adjust track tension (TM 5-5420-226-10).
31.
Test drive vehicle a short way (TM 5-5420-226-10).
32.
TA169309
End of Task
14-45






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.