• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRACK DRIVE SPROCKET REPAIR AND REPLACEMENT - Continued
TRACK DRIVE SPROCKET REPAIR AND REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  802    803    804    805    806  807  808    809    810    811    812  
img
TM 5-5420-226-20-3
TRACK DRIVE SPROCKET REPAIR AND REPLACEMENT (Sheet 7 of 9)
Using hammer and block, tap at all tapered bushings (C) into place in sprocket (A).
Apply light coat of lubricant to threads of 11 bolts (D) and new nuts (E) before installing
5.
them.
6. Manually install 11 bolts (D) and using 15/16 inch
socket and torque wrench, tighten bolts (D) to
140-190 lb-ft (190-258 N m) to secure sprocket
(A) to hub (B).
Install 11 nuts (E) onto bolts (D).
7.
Using 15/16 inch socket and torque wrench, tighten nuts (E) to 115-165 lb-ft
8.
(156-224 N m).
TA169326
Go on to Sheet 8
14-62






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.