• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOWING PINTLE REPAIR - Continued
TOW CABLE HOOK REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  905    906    907    908    909  910  911    912    913    914    915  
img
.
TM 5-5420-226-20-3
TOWING PINTLE REPAIR (Sheet 5 of 5)
Aline hole in pintle (B) with slot on
18.
nut (Q).
Using pliers, install new cotter pin (R)
19.
through nut (Q) and pintle (B).
Using pliers, bend ends of cotter pin
20.
(R) to secure cotter pin in place.
Using 5/16 inch socket, install fitting
21.
(S) in sleeve (J) and position as shown.
INSTALLATION:
Install towing pintle (A) in vehicle mounting
1.
brackets.
Install four bolts (B), lockwashers (C)~
2.
and nuts (D).
Place 1-5/16 inch wrench on four nuts
3.
(D).
Using 1-5/16 inch socket, tighten four bolts
4.
(B).
TA169418
End of Task
16-6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.