• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  925    926    927    928    929  930  931    932    933    934    935  
img
.
TM 5-5420-226-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 6 of 10)
Top Deck Door Panels Replacement (Sheet 2 of 2)
INSTALLATION:
1.
Install access cover panel (A) into frame
(B).
2.
Install door (C) into top deck frame (B).
Using 9/16-inch socket and ratchet, install
four screws (D), lockwashers (E), and flat
washers (F) securing door.
3.
Install cover (G) into top deck frame (B).
Using 9/16 inch socket and ratchet, install
four screws (H), lockwashers (J), and flat
washers (K) securing cover (G).
4.
Install door (L) into top deck frame (B).
Using 9/16 inch socket and ratchet, install
four screws (M), lockwashers (N), and flat
washers (P) securing door (L).
End of Task
TA169438
16-26






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.