• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  926    927    928    929    930  931  932    933    934    935    936  
img
. . . . .
TM 5-5420-226-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 7 of 10)
Top Deck Insulator Panel Replacment (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
16-27
Removal
16-29
Installation
Ratchet with 1/2 in. drive
TOOLS:
7/16 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
Drift pin
Hoist (capable of lifting 4,000 pounds)
SPECIAL TOOLS: Sling (Item 31, Chapter 3, Section 2)
Two
PERSONNEL:
Remove top deck (page 16-21)
PRELIMINARY PROCEDURES:
Remove top deck door panels (page 16-25)
REMOVAL:
Using 7/16 inch socket, remove seven
screws (A) and strap (B) from frame
(C).
Fasten two hoist chains to end (D) of
top deck (E).
TA169439
Go on to Sheet 2
16-27






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.