• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section III. PRINCIPLES OF OPERATION
Section II. SERVICE UPON RECEIPT

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  1    2    3  4  5    6    7    8    9  
img
. .
TM 5-5420-228-24
CHAPTER 2
MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and
Equipment (MTOE) applicable to your unit.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Special tools for organizational, direct support, and general support maintenance are listed in
TM 5-5420-202-20P and TM 5-5420-202-34P, which are the authority for requisitioning
replacements.
1.
Adapter, EU male 90°
Test flow of relief check
518428 (8D212)
valves during adjustment.
2.
Adapter, straight
Test flow of relief check
980693 (61848)
valves during adjustment.
3.
Gage, pressure, dial
Test flow of relief check
indicating 980279 (61848)
valves during adjustment.
4.
Hose assembly
Test flow of relief check
981005 (61848)
valves during adjustment.
REPAIR PARTS
Repair parts are listed and illustrated in TM 5-5420-202-20P and TM 5-5420-202-34P which
are the authority for requisitioning replacements.
TA251303
2-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.