• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STE/ICE Test Procedures - Continued
STE/ICE Test Procedures - Continued

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  67    68    69    70    71  72  73    74    75    76    77  
img
. . . . .
TM 5-5420-228-24
STE/ICE Test Procedures - Continued
HEU PRESSURE 0-4000 PSIG TEST 51 .
NOTE
This procedure is to be performed by
two persons. The lead person is referred
to as the first technician and shall direct
the activity of the second person called
the second technician.
1
Perform VTM GENERAL SET UP (page
2-42) and CONFIDENCE TEST NO. 66
(page 2-44).
2
Connect test cables and pressure transducer.
Do OFFSET test.
First Technician (Operator's Station)
Move ball valve to "TRAVEL" position.
Stop engine.
Relieve hydraulic pressure (page 3-71).
Connect P1 of transducer cable W4 to J2 or J3
on VTM.
Connect P2 of transducer cable W4 to adapter
MS3119E14-19.
Connect P1 of second transducer cable W4 to
adapter MS3119E14-19.
Second Technician (Dual Counterbalance Valve)
Connect MS3119E14-19 to special QD adapter
hose.
Connect special QD adapter hose, QD end to
T1 or T2 of dual counterbalance valve test port
QD.
Change 3
2-58.1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.