• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  104    105    106    107    108  109  110    111    112    113    114  
img
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION ­ HYDRAULICS
(Continued)
Symptom-3.1
HEU BRIDGE DOES NOT SCISSOR OPEN OR DOES NOT OPEN SMOOTHLY.
NOTE
This procedure is to be performed by
two persons. The lead person is referred
to as the first technician and shall direct
the activity of the second person called
the second technician.
1
Check bridge quick disconnects for proper
operation.
First Technician (Operator's Station)
· Return bridge to bridge seat (TM-10).
· Shut engine off.
· Move ball valve to "TRAVEL" position.
· Cycle bridge launching control levers.
Second Technician (Bridge)
· Check quick disconnects between bridge and
launcher are connected and secure.
Do quick disconnects operate properly?
2
· Replace quick disconnects (TM 5-
NO
5420-203-14).
YES
2-80.2
Change 3






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.