• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  108    109    110    111    112  113  114    115    116    117    118  
img
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
LAUNCHER OPERATION ­ HYDRAULICS
(Continued)
Symptom-3.1
9
Check center section hinge pins for damage.
Second Technician (Bridge)
Visually check inside and outside center
section hinge pins for broken or damaged
condition.
Are center section hinge pins broken or
damaged?
10
Replace damaged center
section hinge pins (TM 5-5420-
YES
203-14).
NO
2-80.6
Change 3






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.