• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE BANK ASSEMBLY CONTROLS REPLACEMENT (Sheet 1 of 2)
Section III. FILTER, HOSE ASSEMBLIES, AND ASSOCIATED HYDRAULICS

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  286    287    288    289    290  291  292    293    294    295    296  
img
.
TM 5-5420-228-24
VALVE BANK ASSEMBLY CONTROLS REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
1.
Manually start pin (A) through
valve bank (B).
While tapping pin (A), install
2.
ten spacers (C) and five
control levers (D) as shown.
3.
Using pliers, install two washers
(E) and cotter pins (F).
Place ten links (G) in position.
4.
5.
Manually install ten
straight pins (H).
6.
Using pliers, install ten cotter
pins (J).
7.
Manually screw five knobs (K) onto five control levers (D).
8.
Operate each control lever (D) to insure
proper operation (TM 5-5420-202-10).
End of Task
TA251522
3-124






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.