TM 5-5420-228-24
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 5 of 17)
17.
Manually disconnect hose assembly
(U) at quick disconnect (V).
Using 9/16 inch wrench, disconnect
18.
hose assembly (W).
19.
Using 1-1/2 inch wrench, disconnect
hose assembly (X).
20.
Using 1/4 inch screw key, remove
pipe plug (Y) from valve bank (Z).
Using 3/4 inch wrench to hold five
nuts (AA), use 3/4 inch socket to
loosen five screws (AB).
Manually remove five screws (AB),
Using second technician, remove valve
bank (Z) and brackets (AD) to
a suitable work area.
TA251706
Go on to Sheet 6
4-57