HEU VALVE BANK PREFORMED PACKINGS AND FITTINGS REPLACEMENT (Sheet 2 of 2)
HEU VALVE BANK ASSEMBLY CONTROLS REPLACEMENT (Sheet 2 of 2)

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  630    631    632    633    634  635  636    637    638    639    640  
img
. . .
TM 5-5420-228-24
HEU VALVE BANK ASSEMBLY CONTROLS REPLACEMENT (Sheet 1 of 2)
PROCEDURE INDEX
Procedures
Page
Removal
4-72
Installation
4-73
TOOLS:
Long round nose pliers
9/16 in. combination box and open end wrench
Hammer
SUPPLIES:
Lockwasher (3 required)
REFERENCE: TM-10
PRELIMINARY PROCEDURES: None
REMOVAL:
1.
Using long round nose pliers, remove two C-clips (A) and two washers (B).
2.
Using long round nose pliers, remove ten C-clips (C).
3.
Remove ten straight pins (D) and links (E).
4.
Using long round nose pliers, slowly pull out rod (F).
5.
Remove five control levers (G).
6.
Manually remove five knobs (H) by unscrewing from control levers (G).
7.
Using 9/16 inch wrench, remove three screws (J) and three lockwashers (K). Remove control bracket (L).