• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section 11. MAINTENANCE ALLOCATION CHART - Continued
SECTION III. SPECIAL TOOL AND TEST EQUIPMENT REQUIREMENTS

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  654    655    656    657    658  659  660    661    662    663    664  
img
TM 5-5420-228-24
Section Il. MAINTENANCE ALLOCATION CHART - Continued
(5)
(6)
(3)
(4)
(1)
(2)
Tools and
Maintenance Category *
Remarks
Group
Maintenance
Component/
Number
Assembly
equipment
function
C
D
2407
Locking
Inspect
1.0
Cylinder
Replace
2.0
5, 6, 8
Repair
4.0
16, 17, 19
Overhaul
6.0
11, 12, 16, 19
2407
Cylinder Armor
Inspect
1.0
Replace
(Overhead)
0.4
5
Repair
0.5
7, 8, 9, 10
2407
Cylinder Armor
Inspect
1.0
(Tongue)
Replace
0.4
5
Repair
0.5
7, 8, 9, 10
2407
Cylinder Armor
1.0
Inspect
(Holddown)
Replace
0.2
5
Repair
0.5
7, 8, 9, 10
2408
Reservoir
1.0
Inspect
Hydraulic
Replace
7.0
5, 17, 19
Repair
3.0
10, 11, 13
2408
Breather hood
Service
0.1
Replace
0.1
5
6714
Antenna Base
0.1
Inspect
Armor
Replace
0.2
5
Repair
0.5
7, 8, 9, 10
C-operator/crew
*The subcolumn are as follows:
H-general support
l *Indicates WT/MH required
O-organizational
D-Depot
F-direct support
TA251267
B-6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.