Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-7
13
Before
Right front
unfolding
mechanism (4)
Check torsion bar, stabilizer lever,
retaining pins, and turnbuckle for
structural damage.
Damage prevents
proper operation
of unfolding
mechanism.
4
14
Before
Travel latch (6),
receptacle (5),
and cable
guide (7)
Check for structural damage and
proper latch movement.
Damage prevents
latch from being
engaged in
receptacle.
6
7
5