Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-21
39
During
Front
transverse
upper coupling
(7) and
receptacle
blocks (6)
Check for proper operation and
structural damage.
Damage prevents
coupling from
proper operation
or seating in
receptacle.
38
During
Right front
longitudinal
upper
coupling (4)
and receptacle
blocks (5)
Check for proper operation and
structural damage.
Damage prevents
coupling from
proper operation
or seating in
receptacle.
4
6
7
6
5