Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Interior Bay.
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0016 00
0016 00-2
1
Before
Four trunnions
(1) on left outer
ponton
Check for cracks or broken welds, or if
bent.
Cracked or broken
welks are found, or
if bent enought to
prevent securing
bay to transporter.
2
Before
Left and right
outer and inner
ponton drain
plugs (2)
Check for damaged drain plugs.
Damage allows
water to enter
ponton. Any visible
hole will deadline
bay.
1
2
NOTE
The time requirement to
complete Before operation
PMCS is 5 minutes per bay.