Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Interior Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0016 00
0016 00-5
8
Before
Right unfolding
mechanism (1)
a. Check bracket, stabilizer lever,
rubber bumper, spring, and
turnbuckle for physical damage.
b. Check cable for looseness, kinks,
broken strands, or compression.
a. Damage prevents
proper unfolding
operation.
b. Cable is loose,
kinked, or
compressed, or
broken strands are
noted.
1
1
1
1
~
~
~
9
Before
Travel latch (3)
and receptacle (2)
Check for structural damage, missing
latch.
Latch is missing or
damage prevents
latch movement/
proper operation.
2
3