TM 5-5420-278-10
0020 00
0020 00-2
LOADING BAP FROM GROUND (Contd)
NOTE
Perform steps d and e if BAP PLS feet are not in
stowed position. Make sure hitch pin chains are stored
between PLS foot and BAP frame.
d. Remove two quick-release pins (10) from pins (6), and remove pins (6) and PLS
foot (9) from bracket (8) at both sides of BAP frame (7).
e. Holding PLS foot (9) in stowed position, install PLS foot (9) on bracket (8) with
two pins (6) and quick-release pins (10) at both sides of BAP frame (7).
DOWN POSITION
STOWED POSITION
1
2
5
4
3
6
7
8
9
9
7
8
6
10
10
NOTE
Perform step c if BAP winch hydraulic hoses are
disconnected from stowage couplings.
c. Connect winch hydraulic hoses (3) and (4) to stowage couplings (2) and (5),
located on winch frame bracket (1).