TM 5-5420-278-10
0050 00
00-1
1
2
3
4
5
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF BAP
CAUTION
Main frame of LHS must be in its fully stowed position.
Attempting to lift BAP with main frame not stowed
could result in damage to equipment.
NOTE
Manual mode operations using cab control box are to be
performed only when normal AUTO mode electric
circuit is malfunctioning.
This procedure is performed when a loaded BAP must
be removed using a crane or other handling system and
must be down with the help of a higher maintenance
level.
a. Ensure LHS main frame is fully stowed (down). If LHS main frame is not
fully stowed, lower LHS main frame by following solenoid manual bypass
procedure (WP 0049 00, Manually Bypassing Solenoid During Electric Power
Loss).
WARNING
Winch frame must be locked to BAP prior to unloading
BAP to ground or damage to equipment or injury to
personnel may result.
NOTE
When both levers are in UP position, winch frame is
locked to BAP. Perform steps b and c if levers are in the
DOWN position.
b. Remove quick-release pin (2) from stud (4) at both sides of winch frame (3).
c. Swing lever (5) up so that end of stud (1) is through hole in lever (5), and
install quick-release pin (2) on stud (1) at both sides of winch frame (3).