TM 5-5420-278-24&P
0035 00
0035 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
PUMP MAINTENANCE
REMOVAL, DISASSEMBLY, ASSEMBLY, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Four lockwashers (WP 0107 00)
Three O-rings (WP 0107 00)
Two cotter pins (WP 0108 00)
Four lockwashers (WP 0108 00)
Four drive screws (WP 0108 00)
Two lockwashers (WP 0108 00)
Gasket (WP 0108 00)
Teflon pipe sealant (Item 15, WP 0134 00)
Cap and plug set (Item 5, WP 0134 00)
Fluid (Item 17, WP 0134 00)
References
WP 0001 00
WP 0038 00
Equipment Condition
Ramp bay removed from transporter
(TM 5-5420-278-10).
Ramp bay unfolded or inner pontons separated and
unfolded (WP 0023 00).
Pump drained (WP 0032 00).