TM 5-5420-278-24&P
0048 00
0048 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
LOWER MAIN COUPLING REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Materials/Parts
Gasket (WP 0124 00)
Unlike metal compound (Item 18, WP 0134 00)
Adhesive (Item 1, WP 0134 00)
References
WP 0059 00
WP 0125 00
Equipment Condition
Inner pontons separated (WP 0042 00).