TM-5-5420-279-10
3.9.9.4
Prior to lifting, ensure that the carriage is level horizontally and vertically with respect to
the upper part of the carriage.
NOTE
It is extremely important that the two carriage parts are in line vertically and horizontally.
Failure to ensure correct alignment will result in the bottom half of the carriage becoming
jammed in the top half of the carriage when it is raised.
ENSURE THAT SLINGS ARE
NOT TWISTED OR
UNEVENLY SPACED
ENSURE THAT SLINGS ARE
NOT TWISTED OR
UNEVENLY SPACED
Figure 3. 36 Method and Location of
Slinging Home Bank Carriage
3-68