TM-5-5420-279-10
Table 8.5 Operators PMCS (After) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
142
After
Tail-lift
Check all tail-lift straps for:
straps
(a) Cuts.
Cuts in fabric evident.
(b) Chafing.
Chafing evident.
143
After
Tail-lift
Check all stored items on the tail-lift for
Damage evident.
stores
damage i.e. Crane spreader pads and
step ladder.
1
2
3
144
After
Far bank
Check oil level in far bank support reservoir.
support
145
After
Far bank
Check far bank support hydraulic pipes (1)
support
for:
(a) Damage.
Damage evident.
(b) Hydraulic leaks.
Class III leak
evident.
146
After
Far bank
Check far bank support hydraulic pistons
support
(2) for:
(a) Damage.
Damage evident.
(b) Hydraulic leaks.
Class III leak
evident.
147
After
Far bank
Check far bank support hinge points (3) for:
support
(a) Damage.
Damage evident.
(b) Excessive play.
Excessive play
evident.
8-48