TM-5-5420-279-10
Table 8.5 Operators PMCS (After) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
2
4
1
3
Damage evident.
186
After
Crane right
(a) Visually, examine the crane R/H
hand (R/H)
stabilizer leg (1) for damage.
stabilizer
Damage or class III
(b) Visually, examine the crane R/H
leg
leak evident.
stabilizer leg cylinder (2) and pipes for
damage or fluid leaks.
Pin and clip not
(c) Check crane (R/H) stabilizer leg
fitted.
cable (4) is fitted and secured with pin
and clip (5).
(d) Check cable for damage.
Damage evident.
NOTE
R/H crane stabilizing leg pin must be fitted from REAR (launcher side).
187
After
Crane (R/H)
(a) Check crane (R/H) stabilizer leg
stabilizer leg
securing pin (3) is fitted from REAR
securing pin
(launcher side) and R clip is fitted.
(b) Check pin for damage.
Damage evident.
188
After
Crane (R/H)
Check crane (R/H) stabilizer
Not pinned and R
stabilizer
extension beam is fully retracted and
clipped.
extension
pin and R clip is fitted.
beam
8-61