• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUNCTION OF THE PALLET LAUNCHER MECHANISM
CHAPTER 2. OPERATOR INSTRUCTIONS RAPIDLY EMPLACED BRIDGE (REB)

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  58    59    60    61    62  63  64    65    66    67    68  
TM 5-5420-280-10
0004 00
THEORY OF OPERATION (Contd)
HOW THE BRIDGE IS EMPLACED (Contd)
both bridge halves are engaged. Then the lower bridge half is tilted toward the
upper bridge half until the upper couplings on both bridge halves lock. The coupled
bridge is then driven to the rear until the entire length of the bridge is extended
over gap (river, gully, or ditch) to be crossed. The pallet launch boom and lower
support boom lower far shore end of bridge to ground, and the pallet winch lowers
near shore end to ground. Bridge retrieval is performed basically in reverse order.
END OF WORK PACKAGE
0004 00-3/4 blank






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.