TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
5. Back up CBT on shore so end of pallet is approximately 3 ft (0.9 m) from edge
of gap. Apply service brake (3), move transmission selector lever (2) to N
(neutral), and pull PARKING BRAKE control (1) out. Chock front wheels.
1
3
2
NOTE
CBT must be level within 2.5 degrees ( 5%) from
front-to-rear and side-to-side prior to leveling pallet.
Repeat steps 5 and 6 until CBT is level within range.
Observe that bridge quarters and launch beam of both
bridge halves are centered and aligned on pallet. If out of
alignment, refer to WP 0036 00, and align bridge halves
prior to launching bridge.
6. Check front-to-rear leveling gauge (4) and side-to-side leveling gage (6) to
ensure bubbles (5) are visible within 2.5 degrees ( 5%).
5
4
5
6
3 ft
(0.9m)
0016 00-4