• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BYPASS VALVE, CLOSED POSITION - TM-5-5420-280-100167
Explanation of RCU Display Screen Text

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  139    140    141    142    143  144  145    146    147    148    149  
TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
5. Back up CBT on shore so end of pallet is approximately 3 ft (0.9 m) from edge
of gap. Apply service brake (3), move transmission selector lever (2) to N
(neutral), and pull PARKING BRAKE control (1) out. Chock front wheels.
1
3
2
NOTE
CBT must be level within 2.5 degrees ( 5%) from
front-to-rear and side-to-side prior to leveling pallet.
Repeat steps 5 and 6 until CBT is level within range.
Observe that bridge quarters and launch beam of both
bridge halves are centered and aligned on pallet. If out of
alignment, refer to WP 0036 00, and align bridge halves
prior to launching bridge.
6. Check front-to-rear leveling gauge (4) and side-to-side leveling gage (6) to
ensure bubbles (5) are visible within 2.5 degrees ( 5%).
5
4
5
6
3 ft
(0.9m)
0016 00-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.